Dated photos from Blue Paradise Village, newest first. Building 1 of the Pool Residences is going up now.
-

Outside walls plastered
The outside walls are plastered and the windows are in.
-

First rain shower installed
Bathroom tile done and the first rain shower in place.
-

Up to full height
Building 1 has reached full height, with the outside stairs to the roof terrace in place.
-

Rooflight over the stairs
Daylight straight down the stairwell from the roof.
-

Big door frames going in
The large black-framed doors that open the living space to the garden and pool.
-

Windows installed
Black-framed windows are in, letting the light flood into Building 1.